


Nailing on the Fly Repair
The Nailing on The Fly Repair Line incorporates automated handling equipment to reduce labor cost and increase production with a fraction of the training needed in conventional systems. From the time a damaged pallet enters the system until it exits as a repaired product, it never leaves the assembly line. Using our patented Deckmaster to remove damaged boards and stake down the nails makes for a quick and complete prepping time for the builders, and puts the decision making in one person’s hands. Builders then become board droppers and training time for new employees is minimized. By using powered conveyor, a flipper, and a stacking system with rakes, the backbreaking labor is eliminated, thus reducing workman’s compensation issues, increasing efficiency and employee morale.
Features
Description: Nailing On The Fly Repair Line with Rail & Tool Balancer System
Capacity: Pallets from 32” Wide to 48” Wide, any Length




